Skip to content
All apps

Tugger train planner 3D

About this app

Example 1 from VDI 5586 in 3D: a tugger train supplies 20 line-side locations on four assembly lines from the supermarket, with coupled or decoupled loading and push or pull (kanban card, e-kanban, call button). Live figures show cycle time, train and driver utilisation, order delay and stock-outs, even while the train still has room.

With explain mode: an AI tutor walks you through the app, points out what matters in the scene and answers your questions.

What a tugger train system is

According to VDI 5586, a tugger train system consists of one or more tractors with trailers and a concept for the repeated supply and removal at no fewer than three stops along fixed routes. The train runs on a timetable from the supermarket to the line-side points and swaps full containers for empty ones. Key decisions are loading (coupled: the driver picks the parts; decoupled: an operator preloads the trailers) and the ordering method: push according to the production plan or pull by consumption, for example via kanban card, e-kanban or call button.

What you see

The scenario is an assembly example from a household appliance maker: one supermarket supplies 20 line-side points on four lines, about 250 small load carriers per shift. In 3D, tractor, trailers and trolleys run their tour, and the exchange at each stop plays step by step. You can set loading, ordering method, takt, number of trailers and consumption. Indicators show cycle time and its components, train and driver utilisation, picking share, reporting delay, replenishment lead time and stockouts; a fill-level view shows every point.

Try this

An empty container is only replaced after the reporting delay, the wait for the next tour and the trip itself. If the stock at the line-side point does not cover this replenishment time, supply breaks down even with free space on the train. Set the takt to 90 minutes and watch the stockouts. Or raise consumption to ×1.2 and compare kanban card with call button: the card only returns with the empties, the button reports at once.

Frequently asked questions

What is a tugger train in intralogistics?
A tugger train, also called a milk run, is a tractor pulling several trailers that distributes material on fixed routes and timetables. It supplies several line-side points per tour and collects empties. It replaces many single forklift trips.
What is the difference between coupled and decoupled loading?
With coupled loading, the tugger driver picks the parts in the supermarket. With decoupled loading, a supermarket operator prepares the trailers in advance, and the driver only hitches them. As a guideline, picking should take at most a third of the cycle time when loading is coupled.
How does kanban work with a tugger train?
When a container at the line runs empty, it triggers a replenishment. With a kanban card, the card travels back with the empties; with e-kanban the container is scanned; with a call button the worker reports demand immediately. The shorter this reporting delay, the less stock the line-side point needs.
Which assumptions does the app use?
The train averages 3.6 km/h, and picking takes 2 minutes plus 0.35 minutes per container. Each line-side point has a kanban loop sized for 132 minutes of replenishment time. Time runs in fast motion.

Subject: Technical logistics & intralogistics

More from Technical logistics & intralogistics

A VisuApp by heyprof: interactive, free in your browser, no sign-up. What is a VisuApp? · All apps