Four ways to manufacture: site, job shop, line, flow (3D)
A factory hall rearranges itself from site and job-shop production to line and flow production. Volume and variance decide which principle fits; transport routes, lead time, stock, flexibility and investment update live.
Industrial EngineeringTry it